It's been a while since the last update, but work has been progressing. We've installed the shower in the bathroom - we've built the multi-layered base up with new subfloor...
thin set...
mud set...
and a seamed vinyl pan.
We then stopped and filled the pan with about 2 inches of water for 12 hours to test for any leaks or problems - better to find them now...
Post Script:
We found them now... We seamed the pan incorrectly and had a small leak... had to cut the pan back out - re seamed it, re-layed it. and fixed the leak.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment